Apartment 11 – 2 bed

Total Area Size:
Ground Floor:
102.41m2 / 1102 ft2 First Floor 73.96m2 / 795 ft2

3D2D


Building 1

Disclaimer

Important Notice | Corryard (Crieff Construction Ltd) "The Developer" has a policy of continuous improvement and therefore must reserve the right to change the specification of individual properties without prior notice. The Developer reserves the right to amend the specification as necessary without prior notification but ensure any changed specification is of an equally high standard. Scottish Property Centre, their clients and any joint agents give notice that, although every care is taken to ensure the accuracy of all information provided, the contents do not form part of any contract, or constitute a representation or warranty, and as such should be treated as a guide only. Details should be confirmed with the selling agent and purchasers should not rely on this information but get your solicitor to check plans and specifications attached to your contract and satisfy yourselves by inspection or otherwise. All kitchen, bathroom and en suite layouts are provisional and may be subject to alteration. The plans represented in this brochure are not drawn to scale and are for illustrative purposes only. Consequently they do not form part of any contract. The project is new build that is currently under onstruction. Measurements provided have not been surveyed on site. The measurements have been taken from architect’s plans and as such may be subject to variation during the course of construction. None of the apartments described have been completed at the time of this document going to print, please consult with the sales representative before making a purchasing decision. Please note that items specified in literature and later in our show home may depict appliances, fittings and decorative finishes that do not form a part of the standard specification. The computer generated images and specification photographs are for illustrative purposes and are indicative only. External appearance may be subject to variation upon completion of the project. Purchasers choices of specification items are subject to build programme and will therefore be time limited.